|
Terry
Fritz's Tesla-Coil E-Field Simulator:
E-Tesla6 |
|
|
|
|
|
|
|
The
inputfile fields ar filled, as far as making sense, from the data |
Large files for potential
(voutput.xls) and field-stress (soutput.xls) are available |
|
within the "TC
calc." sheet. - "Result C" is fed back to sheet "TC
calc." |
|
|
but it is recommended to handle/view
them externally from this workbook. |
|
|
|
|
|
|
<Ctrl
t> |
Result C = |
0 |
pF |
|
<Ctrl r> |
|
|
|
E-Tesla
inputfile: INPUT.TXT |
for ceiling h=600cm : |
83,96062 |
pF |
|
E-Tesla outputfile:
OUTPUT.TXT |
|
|
Room for your
comments... |
|
|
|
********************************* |
|
E-TESLA V6.12C
May 27 |
2001 |
|
* "Black&White" TC
for 10kVA+ (caps: 3 Maxwell
0.3uF/100kV) |
|
|
Type <Ctrl+e> to set the environment |
|
* E-tesla
command file |
|
Grid Size = 151.000000 |
|
(Active-X Buttons don't
work for this) |
|
* lines
beginning with '*' are |
|
Scale Multiplier =
0.393701 |
|
|
*
considered comments |
|
Terminated Coil |
|
Why:
DOS program E-Tesla6.exe |
|
* |
|
Ceiling Distance =
600.000000 |
|
is looking for file input.txt in the |
|
********************************* |
|
Wall Distance =
300.000000 |
|
default
Excel-file-folder's path. |
|
* Grid size
between 50 and 1000 (or more.....) |
|
Primary Height (Inner
Turn) = 70.000000 |
(Excel must have been
set to this |
|
151 |
|
Primary Inner Diameter =
50.000000 |
folder, before starting
E-TeslaRun.xls). |
|
*
Measurement Units 1=mm; 2=cm; 3=inches; 4=feet; 5=meters |
Primary Outer Diameter =
85.480003 |
|
|
2 |
-------> |
cm |
1 |
<--- units conversion const. |
Primary Height (Outer
Turn) = 70.000000 |
Original default Excel-File path is: |
|
*Is
secondary Bare or Terminated 1=BARE; 2=TERMINATED |
|
Strike Rail Height =
80.500000 |
|
C:\WINNT\Profiles\galet\Bureau\Nouveau
dossier |
2 |
|
Strike Rail Diameter =
89.000000 |
This workbook's path is: |
|
* Height of
the Ceiling: outdoors Coil h ~ 40% ceiling h |
|
Secondary Base Height =
70.000000 |
C:\WINNT\Profiles\galet\Bureau\Nouveau
dossier |
250 |
cm |
|
Secondary Diameter =
40.132999 |
|
* Distance
between Wall and Coil ca.50...100% of ceiling h / > 1 x coillength |
Secondary Length =
177.000000 |
|
|
|
150 |
cm |
|
Secondary Inductance
(mH) = 54.028761 |
|
|
|
* Height of
the inner turn of the primary coil |
|
Terminal-1 Height
(center) = 250.000000 |
|
|
|
70 |
cm |
|
Terminal-1 Cord Diameter
= 1.800000 |
|
|
|
* Inner
diameter of the primary coil |
Solenoids not allowed |
Terminal-1 C-C Diameter
(toroid only)= 42.000000 |
|
|
35 |
cm |
|
in E-Tesla6 calculations
! |
Terminal-2 Height
(center) = 290.000000 |
|
|
* Outer
diameter of the primary coil |
|
Terminal-2 Cord Diameter
= 40.000000 |
|
|
67,56256 |
cm |
|
Terminal-2 C-C Diameter
(toroid only)= 120.000000 |
|
|
* Height of
the outer turn of the primary |
|
Top Voltage =
500000.000000 |
|
|
85 |
cm |
|
Pass Ccalc (pF) Change Fcalc (Hz) |
|
|
* Height
from the floor of the strike rail ( 0 if none ) |
|
1000 |
|
C=48.81404 Err%=4881303.500000 F=98002.07 |
|
80,5 |
cm |
|
2000 |
|
C=69.13709 Err%=41.633633 F=82347.81 |
|
|
* Diameter
of the strike rail ( 0 if none ) |
|
3000 |
|
C=76.47244 Err%=10.609859 F=78298.80 |
|
|
67,67691 |
cm |
|
4000 |
|
C=79.96667 Err%=4.569262 F=76569.02 |
|
|
* Height of
the first turn of the secondary |
|
5000 |
|
C=81.79075 Err%=2.281054 F=75710.40 |
|
|
80 |
cm |
|
6000 |
|
C=82.77240 Err%=1.200200 F=75260.11 |
|
|
* Diameter
of the secondary coil |
|
7000 |
|
C=83.30740 Err%=0.646354 F=75018.05 |
|
|
20,00 |
cm |
|
8000 |
|
C=83.60096 Err%=0.352378 F=74886.23 |
|
|
* Length of
the secondary coil44 |
|
9000 |
|
C=83.76274 Err%=0.193515 F=74813.88 |
|
|
100,05 |
cm |
|
10000 |
|
C=83.85216 Err%=0.106756 F=74773.98 |
|
|
*
Inductance in millihenry of the secondary coil |
|
11000 |
|
C=83.90176 Err%=0.059151 F=74751.88 |
|
|
48,02 |
mH |
|
12000 |
|
C=83.92914 Err%=0.032634 F=74739.68 |
|
|
* Height of
the first terminal: center of toroid or sphere |
|
13000 |
|
C=83.94440 Err%=0.018180 F=74732.88 |
|
|
160 |
cm |
|
14000 |
|
C=83.95293 Err%=0.010167 F=74729.09 |
|
|
* Cord
diameter of the first toroid / diameter of sphere |
|
15000 |
|
C=83.95751 Err%=0.005447 F=74727.05 |
|
|
5 |
cm |
|
16000 |
|
C=83.95960 Err%=0.002496 F=74726.12 |
|
|
* Center to
Center diameter of the first terminal / zero for sphere |
|
17000 |
|
C=83.96043 Err%=0.000983 F=74725.75 |
|
|
15 |
cm |
|
18000 |
|
C=83.96060 Err%=0.000198 F=74725.68 |
|
|
* Height
above floor of the second terminal: center of toroid or sphere |
19000 |
|
C=83.96062 Err%=0.000033 F=74725.66 |
|
|
160 |
cm |
|
|
|
* Cord
diameter of the second toroid / diameter of sphere |
|
Numeric value of C = |
pF |
|
|
20 |
cm |
|
|
|
* Center to
Center diameter of the second terminal / zero for sphere |
|
|
55 |
cm |
|
|
|
* Top
voltage |
|
|
|
350000 |
V |
|
|
|
* Confirm
that the above values are correct |
|
|
83,96062 |
pF |
|
|
|
|
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|